PJ2T Outside Maintenance Plan

Definitions - "Outside Maintenance" encompasses ongoing care of all of the station components that are outside of the house, including towers, antennas, feedlines, rotors, radials, cabling, switchboxes, and transformers. "Ongoing care" includes rust and corrosion control, periodic inspections, and replacement of broken components. (Upgrades, such as addition of antennas, are NOT considered maintenance.)

Tower Scraping and Painting Schedule and Record of Work

Legend: "H" = Herko (contractor), "Z" = WB9Z, "CG" = W0CG, "CCC" = Club members in general. Tower sections are numbered from the top down. Greyed out means completed. Green shows the date each section was actually done. 

Eur 10 Eur 9 Eur 8 Eur 7 Eur 6 Eur 5 Eur 4 Eur 3 Eur 2 Eur 1 US 8 US 7 US 6 US 5 US 4 US 3 US 2 US 1
                                   
Jan 2007                                    
Feb 2007                             CG CG CCC CCC
Mar 2007                 CCC CCC Z Z CG CG        
Apr 2007                                    
May 2007 H  H H H H                          
Jun 2007                                    
Jul 2007                                    
Aug 2007                                    
Sep 2007 25th
Ivory
H
25th
Ivory
H
25th
Ivory
H
26th
Ivory
H
26th
Ivory
H
                  26th
Ivory
CG
CG    
Oct 2007                 CCC CCC     24th
Ivory
CG
24th
Ivory
CG
  24th
Ivory
CG
   
Nov 2007 H  H H H H           CG CG         CCC CCC
Dec 2007           Z Z Z                    
                                   
Jan 2008                                    
Feb 2008                 15th
Ivory
(N1ZZ)
15th
Ivory
(N1ZZ)
        CG CG CCC CCC
Mar 2008           22nd
Ivory
CG
23rd
Ivory
CG
27th
Ivory
CG
CCC CCC 14th
Ivory
Z (CG)
14th
Ivory
Z (CG)
CG 18th
Ivory
CG
       
Apr 2008                                    
May 2008 H  H H H H                          
Jun 2008                                    
Jul 2008                                    
Aug 2008                                    
Sep 2008                             CG CG    
Oct 2008                 CCC CCC     CG CG        
Nov 2008 H  H H H H           CG CG         CCC CCC
Dec 2008           Z Z Z                    
                                   
Jan 2009                                    
Feb 2009                             CG CG CCC CCC
Mar 2009                 CCC CCC Z Z CG CG        
Apr 2009                                    
May 2009 H  H H H H                          
Jun 2009                                    
Jul 2009                                    
Aug 2009                                    
Sep 2009                             CG CG    
Oct 2009                 CCC CCC     CG CG        
Nov 2009 H  H H H H           CG CG         CCC CCC
Dec 2009           Z Z Z                    
                                   

(c:\ham\ccc\stationcommittee\pj2toutsidemaintenance\pj2t.tower.painting.schedule.xls)

Concepts and Assumptions

Cost Calculations

One Time 2006 Cost

We need assistance from Herko and his helper to get the big antennas down and back up with minimal disruption to contesting. Four full Saturdays will be needed.

Possible Funding Sources

How to Decide

Should we present these alternatives to the members and let them vote on the most acceptable option?